Case Studies

Below are a selection of recent studies carried out by Adrian Smith Grass Services. Click on the links for more information and pictures.

Colchester United Football Club

Fraze Mowing

We were called in to do an end of season renovation. This included fraze mowing off surface, groundbreaking, using the Sandmaster to increase drainage. Read more...

Donetsk Stadium Ukraine

Stadium

The pitch was installed and laid by Support in Sport. We were asked to maintain the pitch to a professional level. This included cutting, aeration, fertilising, control of the sub-air system and watering. Read more...

African Nations Cup Competition January 2010

First Game - Cabinda

We were asked to fertilise, cut, water, aerate and maintain the pitches to international playing standard throughout the competition. Read more...